Next week 5/23-5/28 they will be installing siding and A/C sleeves on the south side of the building. They need to enter units 212, 312, 208, 308, 202, and 302 briefly to remove and reinstall the A/C unit. Going forward they will do the A/C sleeves at the same entry of the window installs.